🏗️ Template · Contractor / Construction

Contractor and construction invoice template: stages, variations and retention

An invoice for builders and subcontractors who bill in stages. The sample shows a stage payment, an approved variation and a disposal cost, all tied back to the quote reference.

  • ✓ Stage payments
  • ✓ Variations
  • ✓ Retention-friendly
  • ✓ PDF and print
1Invoice details
2Your business
3Bill to
4Items
5Tax, discount and totals
6Notes, payment and signature
7Design: templates, colours, fonts
Template (15). Each preview below uses your own data.
Colour (15 plus your own)
Rename labels (e.g. “Tax invoice”, “Hours”, “Project”)
✓Does it have what it needs?

    ★Saved in this browser

    Recent documents

    Recurring templates

    Save this document as a repeating template. When it is due, it shows here and one click starts a copy with a new number and dates. Nothing is sent anywhere.

    Everything lives in this browser’s storage. Clearing site data removes it, so use “Save file” for backups.

    Tip: for the cleanest paper output use Print and choose “Save as PDF” (selectable text). Turn off “Headers and footers” in the print dialog.

    Balance due0.00

    Keyboard shortcuts

    Ctrl+Z undo · Ctrl+Shift+Z or Ctrl+Y redo

    Ctrl+P print / save as PDF (prints only the document)

    Ctrl+Shift+D download PDF

    Ctrl+S save a JSON file

    Alt+N add an item · Alt+1/2 edit / preview on phones

    On Mac use Cmd instead of Ctrl. Your work autosaves in this browser as you type.

    Share link

    This link contains the whole document in its address, so there is no server and nothing is uploaded. Anyone with the link can open and print it. Logo and drawn signature are left out to keep the link short.

    How to make a contractor / construction invoice

    1. Pick your country. Use the country selector in the editor to set the currency, date format and tax labels. The sample lines below are only a starting point for contractors and builders.
    2. Enter your business details. Add your name, address, contact details, tax or registration number and a logo if you have one. Save them as a business profile to reuse next time.
    3. Add the customer. Enter the customer’s name and address, and a PO or job reference if they gave you one. Save the customer for repeat jobs.
    4. Edit the line items. Replace the sample contractor / construction lines with your own work. Quantity can be hours, days, units or 1 for a fixed fee. Add a tax rate if you are registered.
    5. Add payment details and terms. Choose the payment terms, add bank or payment-link details and your notes. A due date is calculated from the terms.
    6. Choose a look and export. Pick a template and colour, then download the PDF, print it, or save a PNG. Your work is saved in your browser as you type.

    Why construction invoices need more structure

    Construction billing is different from most other trades because of its size, its length and the number of parties involved. A job might run for months, with money flowing in stages, with changes along the way, and sometimes with part of the payment held back as retention until a defect period ends. A construction invoice should therefore refer to the contract or quote, state which stage or period it covers, list approved variations separately and make any retention visible.

    The sample uses the Corporate layout, which has a structured header and a numbered table that finance departments like. The three lines are a staged payment from a quote, an approved variation, and a waste-disposal cost.

    What a contractor invoice should include

    • Contract or quote reference and the stage or valuation period.
    • Work completed to date against the schedule of payments.
    • Variations: each with reference, approval date and price.
    • Materials and plant, where billed separately.
    • Retention held, if the contract has one, and the amount to be released later.
    • Tax details: VAT, GST/HST or sales tax, and any special construction rules.
    • Payment due date in line with the contract and the local construction payment law.

    Billing structures in construction

    StructureHow it is billedWatch for
    Staged paymentsFixed amounts at agreed stagesStages should match what has been completed
    Progress claimsPercentage complete per valuationFollow notice requirements strictly
    Time and materialsLabour hours plus materialsDaily sheets agreed by the client
    Cost plusCosts plus a fee or marginKeep supporting receipts
    VariationsPriced and approved changesWritten approval before work starts

    Use the quote generator to set out stages before work starts, and the milestone billing guide to plan them.

    Example contractor invoice

    DescriptionQtyRateAmount
    Stage 2 – first-fix carpentry and plasterboard (per quote ref. Q-0042)1$6,400.00$6,400.00
    Variation 1 – additional structural opening1$950.00$950.00
    Skip hire and waste removal1$320.00$320.00
    Subtotal$7,670.00
    Tax at an illustrative 10%$767.00
    Total$8,437.00

    Figures are examples only. Currency, tax rate and labels change in the editor to suit your country.

    The stage payment references the quote number, and the variation was approved in writing before it was done.

    Construction-specific tax and payment rules

    Construction payments are heavily regulated in many countries. A few examples are below; they are not a full list and details change, so use the official links.

    • United Kingdom: the Construction Industry Scheme (CIS) requires contractors to deduct tax from payments to registered subcontractors for labour, and the VAT domestic reverse charge applies to many supplies of construction services between VAT-registered, CIS-registered businesses. HMRC guidance sets out which supplies it covers.
    • United States: contractors commonly bill progress payments with a percentage complete and retainage. Lien rights have strict notice deadlines that vary by state; ask a local professional. A 1099-NEC may be issued to subcontractors.
    • Canada: provinces have construction lien or prompt-payment laws. Ontario’s Construction Act, for example, has a “proper invoice” concept and set payment timeframes. Check your province.
    • Australia: security-of-payment laws set rules for payment claims, and the ATO’s Taxable Payments Annual Report covers some building and construction payments.
    • New Zealand: the Construction Contracts Act sets rules for payment claims and retention money. Check Building Performance or MBIE guidance.

    Common construction invoicing mistakes

    • Starting a variation without written approval.
    • Invoicing a stage that is not yet complete, which gives the client grounds to dispute it.
    • Missing a statutory notice period for payment claims.
    • Not showing retention clearly, then losing track of the release date.
    • Not keeping photos and sign-off sheets for each stage.

    Getting paid faster as a contractor

    Invoice at each stage on the day it is signed off, and keep the schedule of payments visible in the contract. Ask for a deposit before ordering materials. Put the interest rate for late payment in the contract; see late fees and interest on invoices. If you are not paid, follow the sequence in what to do when a client does not pay.

    Glossary

    Retention
    Money held back until the defects period has ended.
    Variation
    A change to the agreed scope of work, with its own price.
    Progress claim
    A request for payment for work completed to date.
    CIS
    Construction Industry Scheme in the UK.
    Check official guidance. We could not fully confirm these points against an official page when we last reviewed, so please verify them before relying on them:
    • Registration thresholds (UK £90,000, Canada $30,000, Australia A$75,000, New Zealand NZ$60,000) change; confirm the current figure with your tax authority.
    • Licence, certificate and payment-claim rules for trades differ by state, province and country. Check your regulator before relying on any note here.

    Frequently asked questions

    What is a variation?

    An approved change to the original scope, with its own price. Always get written approval.

    What is retention?

    A percentage held back from payments until the defects period is over. The contract defines it.

    How do I show the stage on an invoice?

    Describe the stage and reference the quote, as in the example.

    Do I charge VAT or GST on construction work?

    Usually yes if registered, but special rules can apply. Check official guidance for your country.

    What is CIS?

    The UK’s Construction Industry Scheme, where contractors deduct tax from subcontractor payments. See HMRC guidance.

    Can I bill materials separately?

    Yes. Add separate lines for materials and plant.

    How do I bill hourly?

    Set quantity to hours and rate to your hourly rate.

    Is this legal advice on payment claims?

    No. Payment-claim rules are strict and vary by place. Check official guidance or ask a professional.

    Related topics

    • contractor invoice template
    • builder invoice PDF
    • construction invoice
    • subcontractor invoice
    • progress payment invoice
    • variation invoice
    • retention invoice
    • building work invoice