⚡ Template · Electrician

Electrician invoice template: labour, materials and certificates

A compact, dense invoice for electricians. Labour by the hour, materials and the test documentation are ready to edit, with space for your registration scheme number.

  • ✓ Labour, materials, certification
  • ✓ Compact layout
  • ✓ Phone-friendly
  • ✓ PDF and print
1Invoice details
2Your business
3Bill to
4Items
5Tax, discount and totals
6Notes, payment and signature
7Design: templates, colours, fonts
Template (15). Each preview below uses your own data.
Colour (15 plus your own)
Rename labels (e.g. “Tax invoice”, “Hours”, “Project”)
✓Does it have what it needs?

    ★Saved in this browser

    Recent documents

    Recurring templates

    Save this document as a repeating template. When it is due, it shows here and one click starts a copy with a new number and dates. Nothing is sent anywhere.

    Everything lives in this browser’s storage. Clearing site data removes it, so use “Save file” for backups.

    Tip: for the cleanest paper output use Print and choose “Save as PDF” (selectable text). Turn off “Headers and footers” in the print dialog.

    Balance due0.00

    Keyboard shortcuts

    Ctrl+Z undo · Ctrl+Shift+Z or Ctrl+Y redo

    Ctrl+P print / save as PDF (prints only the document)

    Ctrl+Shift+D download PDF

    Ctrl+S save a JSON file

    Alt+N add an item · Alt+1/2 edit / preview on phones

    On Mac use Cmd instead of Ctrl. Your work autosaves in this browser as you type.

    Share link

    This link contains the whole document in its address, so there is no server and nothing is uploaded. Anyone with the link can open and print it. Logo and drawn signature are left out to keep the link short.

    How to make a electrician invoice

    1. Pick your country. Use the country selector in the editor to set the currency, date format and tax labels. The sample lines below are only a starting point for electricians.
    2. Enter your business details. Add your name, address, contact details, tax or registration number and a logo if you have one. Save them as a business profile to reuse next time.
    3. Add the customer. Enter the customer’s name and address, and a PO or job reference if they gave you one. Save the customer for repeat jobs.
    4. Edit the line items. Replace the sample electrician lines with your own work. Quantity can be hours, days, units or 1 for a fixed fee. Add a tax rate if you are registered.
    5. Add payment details and terms. Choose the payment terms, add bank or payment-link details and your notes. A due date is calculated from the terms.
    6. Choose a look and export. Pick a template and colour, then download the PDF, print it, or save a PNG. Your work is saved in your browser as you type.

    What makes an electrician’s invoice different

    Electrical work is regulated work. Beyond the price, the customer is paying for a safe installation and, in many places, a certificate that proves it was tested. Landlords, insurers and later buyers of a house may ask for that paperwork years later, so it helps if the invoice refers to the job and to the certificate issued. The invoice also needs to handle a mix of labour and often significant materials, such as cable, consumer units and protective devices.

    The sample uses the Compact layout, which keeps long material lists on one page. If you prefer more breathing space, try Stripe or Classic.

    What to put on an electrical invoice

    • Business name, address, contact and your registration or licence details as required locally.
    • Job address and description: “Installed 4 double sockets on a new radial circuit, tested and certified”.
    • Labour in hours or as a fixed price.
    • Materials: cable, accessories, consumer unit or protective devices, itemised when large.
    • Certificate or test documentation: note the certificate type and number where applicable.
    • Warranty or guarantee statement for workmanship.
    • Tax number and payment terms.

    Typical electrician pricing

    Job typeTypical pricingInvoice shape
    Repairs and fault-findingHourly plus call-outCall-out, labour, small materials
    InstallationsFixed price from a quoteOne line per installation, certificate line
    Rewires and consumer-unit changesStaged paymentsDeposit, first fix, second fix, test
    Periodic inspection reportsFixed price per propertyOne line per report
    Landlord maintenanceHourly with a rate cardJob address on every line

    Example electrician invoice

    DescriptionQtyRateAmount
    Labour – install 4 double sockets and test circuits5$65.00$325.00
    Materials – sockets, cable, back boxes, consumer-unit RCBO1$148.00$148.00
    Electrical installation certificate / test documentation1$60.00$60.00
    Subtotal$533.00
    Tax at an illustrative 10%$53.30
    Total$586.30

    Figures are examples only. Currency, tax rate and labels change in the editor to suit your country.

    The third line bills the time to prepare the test documentation. Some electricians include this in the price instead.

    Certification and tax by country

    • United Kingdom: notifiable electrical work in dwellings in England is covered by Building Regulations Part P; work is commonly certified with an Electrical Installation Certificate or Minor Works Certificate, and many electricians belong to a competent-person scheme. Check government guidance for exact rules, which differ across the UK nations.
    • United States: electricians are licensed by state or locality; permits and inspections apply to many jobs. Check your licensing board.
    • Canada: electricians are certified provincially and permits are usually required for new installations.
    • Australia and New Zealand: licensed electricians must lodge or provide compliance certificates for certain work in some states and under New Zealand’s regime. Check your regulator’s requirements.

    Tax follows the standard rules for your country: VAT, GST/HST or sales tax once registered.

    Mistakes to avoid

    • Leaving out the certificate or its reference, which causes issues for landlords and insurers.
    • Not itemising high-cost components such as consumer units.
    • Skipping a deposit on a job needing specialist parts.
    • Giving verbal quotes only, then facing a disagreement about what was included.
    • Waiting to invoice until all follow-up visits are done.

    Why the paperwork matters as much as the price

    When a landlord sells a flat, or a buyer’s surveyor asks about an old extension, the question is almost always the same: where is the certificate? An invoice that names the circuit, the date and the certificate reference makes your work easy to find years later, and it protects you if someone else later alters the installation. Keep a copy of every certificate with the job record, and write the same job reference on both documents.

    The other habit worth building is separating testing time from installation time. Testing and certification are skilled work that takes real time, and customers who understand what the line represents rarely challenge it. If you include testing in the price, say so in the description, so it is clear that it is part of the service rather than an afterthought.

    Getting paid faster as an electrician

    Hand over the certificate and invoice together, and state that payment is due on completion for private customers. For landlords and commercial customers, agree terms in advance and use a purchase order. If you use a quote, create it with the quote generator and convert it to an invoice when the work is done.

    Glossary

    Consumer unit
    The fuse board or breaker panel that distributes power in a building.
    Minor works certificate
    A UK certificate for small additions or alterations.
    First fix
    Installing cables and back boxes before plastering.
    Check official guidance. We could not fully confirm these points against an official page when we last reviewed, so please verify them before relying on them:
    • Registration thresholds (UK £90,000, Canada $30,000, Australia A$75,000, New Zealand NZ$60,000) change; confirm the current figure with your tax authority.
    • Licence, certificate and payment-claim rules for trades differ by state, province and country. Check your regulator before relying on any note here.

    Frequently asked questions

    Should I list the certificate on the invoice?

    Yes. It helps customers and any later inspector connect the paperwork to the job.

    Do I need to quote before I invoice?

    A written quote reduces disputes. For small jobs a clear message may be enough.

    How should I charge for materials?

    Charge at cost plus a stated margin, or itemise and attach receipts. State your policy in the terms.

    Can I invoice by the hour?

    Yes. Use quantity for hours and the hourly rate.

    What about staged payments for a rewire?

    Agree stages in the quote, then invoice each stage on completion.

    Do I add VAT or sales tax?

    If you are registered, yes, using the rate that applies. Choose a preset or enter your own in the editor.

    Can I add my scheme number?

    Yes. Put it in the registration field or in the notes.

    Where is my data stored?

    In your browser only.

    Related topics

    • electrician invoice template
    • electrical invoice PDF
    • electrical contractor invoice
    • electrical certificate invoice
    • sparky invoice
    • rewire invoice
    • electrician labour and materials
    • tradesman invoice