Estimate generator

Free estimate generator for trades and services

Give a customer a clear, itemised estimate before you commit to a fixed price. Show labour and material allowances, set how long the figures are valid, and add a line for the customer to acknowledge it. The same engine as our quote tool, with wording that stays an estimate. No sign-up, no cap, nothing uploaded.

  • ✓ Estimate, not a fixed quote
  • ✓ Validity date
  • ✓ Deposit optional
  • ✓ PDF and print
1Estimate details
2Your business
3Prepared for
4Items
5Tax, discount and totals
6Notes, payment and signature
7Design: templates, colours, fonts
Template (15). Each preview below uses your own data.
Colour (15 plus your own)
Rename labels (e.g. “Tax invoice”, “Hours”, “Project”)
✓Does it have what it needs?

    ★Saved in this browser

    Recent documents

    Recurring templates

    Save this document as a repeating template. When it is due, it shows here and one click starts a copy with a new number and dates. Nothing is sent anywhere.

    Everything lives in this browser’s storage. Clearing site data removes it, so use “Save file” for backups.

    Tip: for the cleanest paper output use Print and choose “Save as PDF” (selectable text). Turn off “Headers and footers” in the print dialog.

    Balance due0.00

    Keyboard shortcuts

    Ctrl+Z undo · Ctrl+Shift+Z or Ctrl+Y redo

    Ctrl+P print / save as PDF (prints only the document)

    Ctrl+Shift+D download PDF

    Ctrl+S save a JSON file

    Alt+N add an item · Alt+1/2 edit / preview on phones

    On Mac use Cmd instead of Ctrl. Your work autosaves in this browser as you type.

    Share link

    This link contains the whole document in its address, so there is no server and nothing is uploaded. Anyone with the link can open and print it. Logo and drawn signature are left out to keep the link short.

    How to write an estimate

    1. Describe the job. Name the customer, the site or project, and what you have been asked to price.
    2. Itemise labour and materials as estimates. Use hours and allowances where the exact quantity is not yet known. Say so in the description.
    3. Set a valid-until date. Thirty days is common. Use a shorter period if material prices or your availability change quickly.
    4. Say that this is an estimate. The document title and the notice on the page already do this. Do not call it a quote if the price can still move.
    5. Download or print, then follow up with a quote or invoice. When the scope is firm, issue a quote or an invoice with confirmed figures.

    Estimate vs quote: use the word you mean

    An estimate is a considered guess. The total can change if the scope, the site or the cost of materials changes. A quote is a fixed-price offer: if the customer accepts it before it expires, that price is what you both expect to pay, unless you both agree a variation. Mixing the two words up is how disputes start.

    This page shares the quote engine — the same layouts, tax tools, deposit line and signature block — but the default title, number series (EST-), notice and terms are written for an estimate. If you are ready to stand behind a fixed price, use the quote generator instead and say so clearly on the document.

    Some places have rules about written estimates in certain trades, cooling-off periods, or how a consumer estimate must be presented. Those rules are local. This page is general information, not legal advice. Check your trade regulator or consumer authority if you are unsure.

    What to put in an estimate

    • The word “Estimate” in the title, so nobody treats it as a fixed quote or a tax invoice.
    • A unique number and the date, plus a “valid until” date.
    • The customer and the job or site.
    • Itemised lines for labour, materials and any other allowances, with quantities that you can revise later.
    • Tax, shown the way your customer expects (often inclusive for consumers, exclusive for businesses).
    • A short notice that figures may change, and how you will agree any change in writing.
    • Optional deposit if you need one to book a survey or hold a slot — say that a deposit on an estimate does not turn it into a fixed quote by itself.

    Avoid a single lump sum with no breakdown. A customer cannot tell whether a later change is fair if they never saw how the first figure was built.

    Worked example: a bathroom estimate

    A contractor visits a bathroom and can see the sanitary ware the customer wants, but will not know the condition of the floor or the exact pipe run until work starts. They issue estimate EST-0073: 16 hours of labour at a stated rate, a materials allowance, and a free survey line. The notice says the figures are estimated and that a quote will follow once the floor is opened. The estimate is valid for 30 days. If the floor is sound, the later quote may come in under the allowance; if it is not, they write a variation before continuing.

    When to switch from an estimate to a quote or invoice

    Once the scope is known and you are willing to stand behind the price, send a quote with the same item descriptions and a validity date. When the work is done, send an invoice. If you delivered goods as well, a delivery note records what was handed over. Keeping the language honest at each step is worth more than any layout.

    Tax and legal points on estimates

    An estimate is not a tax invoice. Do not title it as one. If you show tax, treat the figures as indicative and confirm them on the invoice you issue later. Consumer and trade-licensing rules can require a written estimate, a prescribed form, or a cooling-off period in some regions. Check the official guidance that applies to your trade and location. Sources on the quote page and in the box below are a starting point only.

    Mistakes that turn an estimate into an argument

    • Calling it a quote when the price can still move.
    • A lump sum with no lines, so later changes look like a surprise.
    • No validity date, so a customer presents a six-month-old figure after material prices have moved.
    • Starting work without agreeing a change when the site is different from what you estimated.
    • Forgetting that an estimate is not a tax invoice and is not, on its own, a request for payment.

    Glossary

    Estimate
    A priced guess that can change if the scope or costs change.
    Quote
    A fixed-price offer, usually valid until a stated date.
    Allowance
    A provisional amount in an estimate for something not yet measured or specified.
    Variation
    A written change to the scope or price after the original figure was given.
    Check official guidance. We could not fully confirm these points against an official page when we last reviewed, so please verify them before relying on them:
    • Written-estimate, licensing and consumer rules vary by place and trade. Check your local regulator.

    Frequently asked questions

    What is the difference between an estimate and a quote?

    An estimate is a best guess and can change. A quote is a fixed-price offer. Use the word you mean, and use this page for estimates and the quote generator for fixed prices.

    Is an estimate legally binding?

    It is usually a guide, not a fixed contract price, but the exact effect depends on your wording and local law. If you need a binding price, issue a quote and get a clear acceptance. This is not legal advice.

    How long should an estimate stay valid?

    Thirty days is common. Use less if labour or materials move quickly. The valid-until field is on the form.

    Can I ask for a deposit on an estimate?

    You can, for example to book a survey. Say what the deposit is for, and that the estimate is still not a fixed price until you issue a quote or contract.

    Does this use the same tool as the quote generator?

    Yes. Same layouts, tax options, PDF and print. The title, numbering, notice and default terms are written for an estimate so the document does not look like a fixed quote.

    Can the customer sign the estimate?

    Yes. There is an acknowledgement line. Signing an estimate is not automatically the same as accepting a fixed quote. If you want acceptance of a price, send a quote.

    Should the estimate include tax?

    Show tax the way your customer expects, and say the figures are estimated. Confirm tax on the invoice you issue later.

    Is the generator free?

    Yes. No sign-up, no watermark and no limit on documents. It runs in your browser and nothing is uploaded.

    How do I turn an estimate into an invoice?

    When the work is agreed and done, open the invoice generator and enter the confirmed lines, or duplicate and reuse the descriptions. Do not just retitle an estimate as an invoice if the figures have changed.

    Related topics

    • estimate generator
    • free estimate template
    • job estimate PDF
    • construction estimate
    • trade estimate
    • written estimate
    • estimate vs quote